Ünsal Altuncan, & and Tanyer, A M (2018) Context-Dependent Construction Conflict Management Performance Analysis Based on Competency Theory. Journal of Construction Engineering and Management, 144(12).

Alomari, K A, Gambatese, J A and Tymvios, N (2018) Risk Perception Comparison among Construction Safety Professionals: Delphi Perspective. Journal of Construction Engineering and Management, 144(12).

Chen, H, Hu, H, Tang, M, Yang, X and Zhu, J (2018) Hybrid Bored Prestressed Concrete Cased Piles: Equipment and Construction Procedures. Journal of Construction Engineering and Management, 144(12).

Leandro, R, O’Connor, J T and Khwaja, N (2018) Development and Application of a Production-Rate Resource for Contract Time Determination. Journal of Construction Engineering and Management, 144(12).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001572
  • Abstract:
    Work item production rates are essential for contract time determination (CTD) procedures as they are used to estimate the duration of activities needed to complete a highway construction project. For this reason, varied sources and estimation systems provide production-rate data for a variety of work items. Yet these data sources are disjointed and do not provide for any side-by-side comparison of data. This research focuses on the development of an integrated Production Rate Resource, a single, easy-to-use reference of production-rate data gathered from publicly available sources. The resource was developed by gathering production-rate information from multiple sources and organizing the found data into a well-assembled Excel workbook. A proposed process for conducting CTD using the resource is included. The gathered information was tested by estimating the contract time of highway projects using the recommended process. Findings from the application led to significant improvements to the resource. The final version of the Production Rate Resource provides integrated production-rate data for 59 highway construction work items and a recommended process for conducting contract time estimation.

Lee, J I, Lee, H and Park, M (2018) Contractor Liquidity Evaluation Model for Successful Public Housing Projects. Journal of Construction Engineering and Management, 144(12).

Mazher, K M, Chan, A P C, Zahoor, H, Khan, M I and Ameyaw, E E (2018) Fuzzy Integral–Based Risk-Assessment Approach for Public–Private Partnership Infrastructure Projects. Journal of Construction Engineering and Management, 144(12).

Moon, S, Yang, B and Choi, E (2018) Safety Guideline for Safe Concrete Placement Utilizing the Information on the Structural Behavior of Formwork. Journal of Construction Engineering and Management, 144(12).

Nguyen, A, Mollik, A and Chih, Y (2018) Managing Critical Risks Affecting the Financial Viability of Public–Private Partnership Projects: Case Study of Toll Road Projects in Vietnam. Journal of Construction Engineering and Management, 144(12).

Rafiei, M H and Adeli, H (2018) Novel Machine-Learning Model for Estimating Construction Costs Considering Economic Variables and Indexes. Journal of Construction Engineering and Management, 144(12).

Sepasgozar, S M E, Forsythe, P and Shirowzhan, S (2018) Evaluation of Terrestrial and Mobile Scanner Technologies for Part-Built Information Modeling. Journal of Construction Engineering and Management, 144(12).